Browse Items (220 total)

  • Tags: Back hoe

1980 Campus Land Development Project A 03
One in a series of images of a large demolition / construction project underway during the summer of 1980. [Possibly, this is part of the campus drainage improvement plan, as Hoke Hall experienced flooding in 1978.]

1980 Campus Land Development Project A 02
One in a series of images of a large demolition / construction project underway during the summer of 1980. [Possibly, this is part of the campus drainage improvement plan, as Hoke Hall experienced flooding in 1978.] Background from left to right:…

1971 Walter M. Pierce Library Remodel, Boiler 01
Thirteen images of the installation of the new boiler during the remodeling work on Pierce Library.

1971 Walter M. Pierce Library Remodel, Equipment 01
Two images of heavy equipment digging and filling in dirt during the remodeling work on Pierce Library.

1989 Facilities Building, Demolition 01
"1989" Four images taken during the demolition of the old Facilities building. Originally, the main part of the building was called, "Pierce Hall," and it was used as a supplementary dormitory for men. Then, prior to the building of a new Plant…

1989 Walter M. Pierce Library, Exterior Work 01
"1989" An image of work being done on the exterior of Pierce Library, including the addition of a new back entrance.

1988 Campus Land Development 04
"September 1988" An image of campus land being developed in the area near Dorion Hall. Possibly, the beginning of foundation work for the building of Loso Hall.

1988 Campus Land Development 01
"July 1988" An image of campus land being developed in the area near Dorion Hall. Possibly, the beginning of ground clearing for the building of Loso Hall.

1988 Campus Land Development, Tennis Courts 14
"June 1988" An image of campus land development. [Construction of new tennis courts.]
Output Formats

atom, dc-rdf, dcmes-xml, json, omeka-xml, rss2