2012.2.xx027.010.jpg
Six images of workers laying the tile floors during the final phase of remodeling Pierce Library.

2012.2.xx027.004.jpg
Six images of workers laying the tile floors during the final phase of remodeling Pierce Library.

2012.2.xx027.003.jpg
Six images of workers laying the tile floors during the final phase of remodeling Pierce Library.

2012.2.xx027.001.jpg
Six images of workers laying the tile floors during the final phase of remodeling Pierce Library.

2012.2.xx014.009.jpg
Six images of workers laying the tile floors during the final phase of remodeling Pierce Library.

2012.2.xx027.008.jpg
Two images taken during the remodeling of Pierce Library. The first one depicts metal ducts sitting on the rooftop waiting to be installed, and the second shows a room that has finished ducting.

2012.2.xx027.005.jpg
Four images of the various methods that workers utilized to get supplies from ground level up to the rooftop of Pierce Library during the remodel.

2012.2.xx009.006.jpg
Four images of the various methods that workers utilized to get supplies from ground level up to the rooftop of Pierce Library during the remodel.

2012.2.xx009.002.jpg
Four images of the various methods that workers utilized to get supplies from ground level up to the rooftop of Pierce Library during the remodel.

2012.2.xx008.016.jpg
Eleven images of the placing of the support beams for the rooftop on the new addition during the remodeling work on Pierce Library.