One in a series of images of a large demolition / construction project underway during the summer of 1980. [Possibly, this is part of the campus drainage improvement plan, as Hoke Hall experienced flooding in 1978.]
One in a series of images of a large demolition / construction project underway during the summer of 1980. [Possibly, this is part of the campus drainage improvement plan, as Hoke Hall experienced flooding in 1978.]
One in a series of images of a large demolition / construction project underway during the summer of 1980. [Possibly, this is part of the campus drainage improvement plan, as Hoke Hall experienced flooding in 1978.] Background from left to right:…
"September 1988" An image of campus land being developed in the area near Dorion Hall. Possibly, the beginning of foundation work for the building of Loso Hall.
"August 1988" A series of images of a framework that is being erected to provide a cover for the new tennis courts. The structure will also be used as a weather protected, outdoor space for upcoming functions. A crane lifts roofing supports that are…
"July 1988" An image of campus land being developed in the area near Dorion Hall. Possibly, the beginning of ground clearing for the building of Loso Hall.