"September 1988" An image of campus land being developed in the area near Dorion Hall. Possibly, the beginning of foundation work for the building of Loso Hall.
"July 1988" An image of campus land being developed in the area near Dorion Hall. Possibly, the beginning of ground clearing for the building of Loso Hall.
"September 1980" A series of images of the new sidewalks and lighting that were part of the construction project underway during the summer months. Background from left to right: Hoke Hall, Pierce Library, Hunt Hall, Zabel Hall.