A series of images of the interior of Pierce Library taken during the ongoing remodel work. The framework is completed for walls, ceilings, and support structures, but there is still a lot to be done at this point.
A series of images taken during the remodeling work on Pierce Library of the joists and floorboards which will create the second level floor / roof combination and then the second level roof.
A series of images of concrete being poured and smoothed out during the remodeling work on Pierce Library. A new foundation floor is created, as well as a second level floor / ceiling.
A series of images of the interior of Pierce Library taken during the ongoing remodel work. Rooms, hallways, and areas are beginning to take shape as walls, ductwork, ceiling tiles, and lighting are added.