Browse Items (22 total)

  • Tags: Remodel

http://archives.library.eou.edu/images/2012.2.xx009.001.jpg
Four images of the various methods that workers utilized to get supplies from ground level up to the rooftop of Pierce Library during the remodel.

http://archives.library.eou.edu/images/2012.2.xx002.003.jpg
Two images of the smokestack for the remodeled Pierce Library being placed by a crane.

http://archives.library.eou.edu/images/2012.2.xx005.008.jpg
Scaffolding is built up on an exterior wall during the remodeling work on Pierce Library

http://archives.library.eou.edu/images/2012.2.xx008.002.jpg
Seven images of the tarring and papering of the rooftop on the new addition taken during the remodeling work on Pierce Library. xx009 .005 - [Note: There are patches of snow on the ground.] .010 - Inlow Hall is visible in the background.

http://archives.library.eou.edu/images/2012.2.xx008.006.jpg
Eleven images of the placing of the support beams for the rooftop on the new addition during the remodeling work on Pierce Library.

http://archives.library.eou.edu/images/2012.2.xx013.001.jpg
Twenty-three images of the interior of Pierce Library taken during the ongoing remodel work as it begins to near completion.

http://archives.library.eou.edu/images/2012.2.xx005.012.jpg
Nine images of the interior of Pierce Library taken during the ongoing remodel work. The framework is completed for walls, ceilings, and support structures, but there is still a lot to be done at this point.

http://archives.library.eou.edu/images/2012.2.xx001.011.jpg
Ten images of the interior of Pierce Library taken during the ongoing remodel work. Rooms, hallways, and areas are beginning to take shape as walls, ductwork, ceiling tiles, and lighting are added.

http://archives.library.eou.edu/images/2012.2.xx001.001.jpg
Four images of Pierce Library taken during the ongoing remodel work. The foundation for the new addition, the external walls, and the walls for interior study rooms or offices have been completed by this point. The roof for the new addition has yet…

http://archives.library.eou.edu/images/2012.2.xx006.001.jpg
Nine images of the new HVAC system being installed during the remodeling work on Pierce Library.
Output Formats

atom, dc-rdf, dcmes-xml, json, omeka-xml, rss2