Browse Items (22 total)

  • Tags: Remodel

http://archives.library.eou.edu/images/2012.2.71002.001.jpg
"April 1971 - EOC Library addition plans"
One of five images showing the remodel plan for the various levels of Pierce Library.

http://archives.library.eou.edu/images/2012.2.xx008.004.jpg
Thirteen images of the installation of the new boiler during the remodeling work on Pierce Library.

http://archives.library.eou.edu/images/2012.2.xx001.003.jpg
Twelve images of concrete being poured for walls and floors during the remodeling work on Pierce Library.

http://archives.library.eou.edu/images/2012.2.xx002.002.jpg
Eleven images of concrete being poured and smoothed out during the remodeling work on Pierce Library. A new foundation floor is created, as well as a second level floor / ceiling.

http://archives.library.eou.edu/images/2012.2.xx011.001.jpg
Two images taken during the remodeling of Pierce Library. The first one depicts metal ducts sitting on the rooftop waiting to be installed, and the second shows a room that has finished ducting.

http://archives.library.eou.edu/images/2012.2.xx008.001.jpg
Two images of heavy equipment digging and filling in dirt during the remodeling work on Pierce Library.

http://archives.library.eou.edu/images/2012.2.xx001.002.jpg
Fifteen images of Pierce Library taken during the ongoing remodel work. This section mainly portrays the framing and construction of the new walls.

http://archives.library.eou.edu/images/2012.2.xx003.011.jpg
Five images of the same exterior section of Pierce Library taken as the remodel work progressed.

http://archives.library.eou.edu/images/2012.2.xx004.004.jpg
Five images taken during the remodeling work on Pierce Library of the joists and floorboards which will create the second level floor / roof combination and then the second level roof. xx004 .011-.012 - Facilities building is visible in the…

http://archives.library.eou.edu/images/2012.2.xx011.002.jpg
Eleven images of the exterior of Pierce Library taken during the remodeling work as it begins to near completion. Windows have been placed, and the walls and smokestack are getting a coat of paint.
Output Formats

atom, dc-rdf, dcmes-xml, json, omeka-xml, rss2