Eleven images of concrete being poured and smoothed out during the remodeling work on Pierce Library. A new foundation floor is created, as well as a second level floor / ceiling.
Two images taken during the remodeling of Pierce Library. The first one depicts metal ducts sitting on the rooftop waiting to be installed, and the second shows a room that has finished ducting.
Five images taken during the remodeling work on Pierce Library of the joists and floorboards which will create the second level floor / roof combination and then the second level roof. xx004 .011-.012 - Facilities building is visible in theā¦
Eleven images of the exterior of Pierce Library taken during the remodeling work as it begins to near completion. Windows have been placed, and the walls and smokestack are getting a coat of paint.